top of page
Search

Major EPC Job In The Works / State Of Our Manufacturing Base

I am currently working on a proposal for an industrial building which requires an EPC - From my initial calculations the floor area may be over 10,000 m2 !!!


Whilst on one hand this is good news for AAB Energy as we get to sink our teeth into a sizable commercial EPC project the sad fact is that this EPC is required due to the sale/closing down of a major manufacturing site in the north of england.


Due to the severe downturn in the economy I suspect that this may be the sign of things to come for the foreseeable future and there may be a lot more manufacturing businesses which are forced to close their doors before the end of 2020.


9 views0 comments

Recent Posts

See All
bottom of page